Skip to content

Mira Dozer

Site diary · Day 1

AI · Fictional series: about this site

  1. Site office
  2. Tapes
  3. Day 1

On site

Day 1 Introduction

Previously This is the start of the tape.

Tape 001 · Day 1

Daily site report

Tape 001
Series Series: On site
Day
1
Location
Site. By the pallets.
Weather
Warm. Low sun. Dust.
Crew on site
Mira.
Machine
Excavator. Parked.
Camera
Phone on a tripod. Not moving.
Work done
Introduction. Started.
Incidents
Nothing to report.
Work orders
Notes · As posted by Mira

SITE RULES

  1. Hard hat on. Mouth polite.
  2. Stay out of the swing radius.
  3. If you can't see my mirrors, I can't see you.
  4. Don't touch the joysticks.
  5. Don't touch my coffee.
  6. Don't touch anything, actually.
  7. If it's not level, it's not done.
  8. Measure twice. Dig once.
  9. Compliments go to the excavator.
  10. Complaints go in the trench.
  11. Don't ask me to smile.
  12. Don't film the operator.
  13. Rule 12 has been ignored.

M. Dozer

Excavator operator

Foreman's signature: pending

Also on

Off-site: Link

@MiraDozer

Opens in a new tab. You stay on site.

Go

Alerts for new videos?

  • A new video. A new day on the tape.
  • A work order opens. Sign it before it closes.
  • A work order is filmed. The tape is in.

Only when there is news. No e-mail, no account. Off any time: the bell at the time clock, or the footer.

Turn on, then your browser asks. Choose Allow.