Skip to content

Mira Dozer

Site diary · Day 18

AI · Fictional series: about this site

  1. Site office
  2. Tapes
  3. Day 18

On site

Day 18 Level check

Previously Day 17 Mira read out Rule 2. Stay out of the swing radius.

Tape 018 · Day 18

Daily site report

Tape 018
Series Series: On site
Day
18
Location
Site. Open ground. The frame behind. The crane above.
Weather
Warm. Low evening sun. Dust.
Crew on site
Mira. Two operators: not in frame.
Machine
Two excavators. Facing each other. Buckets down.
Camera
Handheld. From the ground. One spot.
Work done
Level check. Rule 7.
Incidents
None reported.
Notes · As posted by Mira

LEVEL CHECK, RULE 7

  • Both operators swear it was level the whole time.

M. Dozer

Excavator operator

Foreman's signature: pending

Also on

Off-site: Link

@MiraDozer

Opens in a new tab. You stay on site.

Go

Alerts for new videos?

  • A new video. A new day on the tape.
  • A work order opens. Sign it before it closes.
  • A work order is filmed. The tape is in.

Only when there is news. No e-mail, no account. Off any time: the bell at the time clock, or the footer.

Turn on, then your browser asks. Choose Allow.