Skip to content

Mira Dozer

Site diary · Day 17

AI · Fictional series: about this site

  1. Site office
  2. Tapes
  3. Day 17

On site

Day 17 Safety lesson

Previously Day 16 Mira went through her safety gear. Rule 1. Hard hat on.

Tape 017 · Day 17

Daily site report

Tape 017
Series Series: On site
Day
17
Location
Site. Open ground. The frame and the crane behind.
Weather
Warm. Evening light. Dust.
Crew on site
Mira. The operator: not in frame.
Machine
Excavator. Out of frame. Bucket in frame.
Camera
Moving. Eye level. Mira stays put.
Work done
Safety briefing. Rule 2.
Incidents
None reported.
Notes · As posted by Mira

SAFETY BRIEFING, RULE 2

  • Topic: excavators.
  • Visual aids: provided by the operator.
  • Safe distance: demonstrated. Sort of.

M. Dozer

Excavator operator

Foreman's signature: pending

Also on

Off-site: Link

@MiraDozer

Opens in a new tab. You stay on site.

Go

Alerts for new videos?

  • A new video. A new day on the tape.
  • A work order opens. Sign it before it closes.
  • A work order is filmed. The tape is in.

Only when there is news. No e-mail, no account. Off any time: the bell at the time clock, or the footer.

Turn on, then your browser asks. Choose Allow.