Daily site report
Tape 017
Series
Series: On site
- Day
- 17
- Location
- Site. Open ground. The frame and the crane behind.
- Weather
- Warm. Evening light. Dust.
- Crew on site
- Mira. The operator: not in frame.
- Machine
- Excavator. Out of frame. Bucket in frame.
- Camera
- Moving. Eye level. Mira stays put.
- Work done
- Safety briefing. Rule 2.
- Incidents
- None reported.
- Notes · As posted by Mira
SAFETY BRIEFING, RULE 2
- Topic: excavators.
- Visual aids: provided by the operator.
- Safe distance: demonstrated. Sort of.
M. Dozer
Excavator operator
Foreman's signature: pending