
No. 1 · Sheet 1 · Zone B4
Gate
Hard hat on. Be polite. Phones: see Rule 13.
Rule 12 “Don't film the operator.” — Mira
Rule 13 “Rule 12 has been ignored.” — Mira
On tape
Not on tape.
Site office · Site plan
A fictional series. Footage made with AI.
Credits →Mira drew this plan. By eye. If it's on tape, it's on the plan.
Swipe to look around. Tap a number.
Swipe to look around. Tap a number.
The foreman's container. The foreman: not seen.
Legend · gate to home
Sheet 1 · Site
RoadHome. After shift.
Sheet 2 · Home
| Rev. | Tape | Change |
|---|---|---|
| 21 | Day 21 | No change. Excavator still at the library. One hole there. |
| 20 | Day 20 | No change. Excavator off site. At the library. |
| 19 | Day 19 | No change. Loader bucket occupied. Overnight. |
| 18 | Day 18 | No change. Level checked. |
| 17 | Day 17 | No change. Swing radius occupied. |
| 16 | Day 16 | No change. Safety gear checked. |
| 15 | Day 15 | No change. Estimate reviewed. |
| 14 | Day 14 | No change. House entered. |
| 13 | Day 13 | Added: house progress. |
| 12 | Day 12 | No change. One like requested. |
| 11 | Day 11 | No change. Excavator climbed, after the shift. |
| 10 | Day 10 | No change. One pipe checked. |
| 9 | Day 9 | No change. Blocks counted. |
| 8 | Day 8 | Detail A added: the container, inside. |
| 7 | Day 7 | Sheet 2 added: home. |
| 6 | Day 6 | Swing radius marked. |
| 5 | Cab radio | No change. Ground compacted. |
| 4 | Day 4 | Found on site: 47 planks, 3 pallets, 1 wheelbarrow (flat), 1 glove (left). |
| 3 | Day 3 | Added: the cab. |
| 2 | Day 2 | No change. |
| 1 | Day 1 | Drawn: gate, site office, excavator, spoil heap, pallets, blocks, frame, crane. |

No. 1 · Sheet 1 · Zone B4
Hard hat on. Be polite. Phones: see Rule 13.
Rule 12 “Don't film the operator.” — Mira
Rule 13 “Rule 12 has been ignored.” — Mira
On tape
Not on tape.
No. 2 · Sheet 1 · Zone D4
The foreman's container. The foreman: not seen.
Rule 5 “Don't touch my coffee.” — Mira
On tape
Not on tape.

No. 3 · Sheet 1 · Zone B3
Compliments go to the excavator.
Rule 3 “If you can't see my mirrors, I can't see you.” — Mira
On tape
Day 1IntroductionDay 2Second attemptDay 3Mira's officeCab radioAttempt to danceDay 6Excavator operatorDay 11End of shiftDay 12One likeDay 16Safety gear offDay 17Safety lessonDay 18Level check

No. 4 · Sheet 1 · Zone B2
Not smiling. Concentrating.
Rule 4 “Don't touch the joysticks.” — Mira
On tape

No. 5 · Sheet 1 · Zone A2
Everything the bucket didn't want.
Rule 8 “Measure twice. Dig once.” — Mira
On tape
Day 1IntroductionDay 2Second attemptDay 3Mira's officeDay 4Found on siteCab radioAttempt to danceDay 6Excavator operatorDay 12One like

No. 6 · Sheet 1 · Zone A3
Found on site. Nobody ordered any of it.
Rule 6 “Don't touch anything, actually.” — Mira
On tape
Day 1IntroductionDay 2Second attemptCab radioAttempt to dance

No. 7 · Sheet 1 · Zone A3
Gray. Heavy. Stacked level.
Rule 7 “If it's not level, it's not done.” — Mira
On tape
Day 1IntroductionDay 2Second attemptCab radioAttempt to danceDay 9MiscalculationDay 16Safety gear off

No. 8 · Sheet 1 · Zone F1
Concrete. Rebar. Not Mira's job.
Rule 1 “Hard hat on. Mouth polite.” — Mira
On tape
Day 1IntroductionDay 2Second attemptDay 3Mira's officeDay 4Found on siteCab radioAttempt to danceDay 6Excavator operatorDay 9MiscalculationDay 16Safety gear offDay 17Safety lessonDay 18Level check

No. 9 · Sheet 1 · Zone E3
Not Mira's. Don't ask.
Rule 2 “Stay out of the swing radius.” — Mira
On tape
Day 10A noise from the pipeDay 17Safety lessonDay 18Level check
Sheet 1 · Zone F3
It goes on the plan when it's on tape.

No. 10 · Sheet 2 · Zone B4
Weekends: Mira is at the house. No visitors.
The house23%
Goes up with the tapes and the orders. Slowly.
Rule 6 “Don't touch anything, actually.” — Mira
On tape
Day 7Getting ready for a dateDay 8Private message to JoeDay 13Mira's home

No. 11 · Sheet 2 · Zone B3 New on site
Small. Level. Enough.
Rule 6 “Don't touch anything, actually.” — Mira
New: Detail A. The container, drawn from the inside.
On tape
Day 7Getting ready for a dateDay 8Private message to JoeDay 13Mira's home

No. 12 · Sheet 2 · Zone C2
No plaster. No comment.
The house23%
Goes up with the tapes and the orders. Slowly.
Rule 7 “If it's not level, it's not done.” — Mira
On tape

No. 13 · Sheet 2 · Zone C3
The old one. Mira's own. Don't compare.
On tape


No. 15 · Sheet 2 · Zone D4
1,000 liters. Rule 6 applies.
Rule 6 “Don't touch anything, actually.” — Mira
On tape
Not on tape.