Daily site report
Tape 004
Series
Series: On site
- Day
- 4
- Location
- Site. The spoil heap: the pile of dug earth.
- Site plan
- Weather
- Warm. Light wind. Dust in the air.
- Crew on site
- Mira.
- Machine
- Not in the picture.
- Camera
- Phone on a tripod. Waist height.
- Work done
- Picked something up.
- Incidents
- One. Caught on camera.
- Work orders
- Work order #003 The planks Open. Decide how.
- Notes · As posted by Mira
FOUND ON SITE TODAY
- 3 pallets
- 1 wheelbarrow, flat
- 47 planks nobody ordered
- 1 glove. Left. Always left.
M. Dozer
Excavator operator
Foreman's signature: pending