Skip to content

Mira Dozer

Site diary · Day 10

AI · Fictional series: about this site

  1. Site office
  2. Tapes
  3. Day 10

On site

Day 10 A noise from the pipe

Previously Day 9 Mira counted the blocks. Twice.

Tape 010 · Day 10

Daily site report

Tape 010
Series Series: On site
Day
10
Location
Site. By the pipes.
Site plan
Weather
Warm. Evening sun.
Crew on site
Mira. Plus one, unconfirmed.
Machine
Not in the picture.
Camera
Phone on a tripod. Not moving.
Work done
Inspected a pipe. With a sledgehammer.
Incidents
One noise. See tape.
Notes · As posted by Mira

TODAY'S TIMESHEET

  • Me: 10 hours.
  • The excavator: 10 hours.
  • The crew: present. Allegedly.

M. Dozer

Excavator operator

Foreman's signature: pending

Also on

Off-site: Link

@MiraDozer

Opens in a new tab. You stay on site.

Go

Alerts for new videos?

  • A new video. A new day on the tape.
  • A work order opens. Sign it before it closes.
  • A work order is filmed. The tape is in.

Only when there is news. No e-mail, no account. Off any time: the bell at the time clock, or the footer.

Turn on, then your browser asks. Choose Allow.