Daily site report
Tape 010
Series
Series: On site
- Day
- 10
- Location
- Site. By the pipes.
- Site plan
- Weather
- Warm. Evening sun.
- Crew on site
- Mira. Plus one, unconfirmed.
- Machine
- Not in the picture.
- Camera
- Phone on a tripod. Not moving.
- Work done
- Inspected a pipe. With a sledgehammer.
- Incidents
- One noise. See tape.
- Notes · As posted by Mira
TODAY'S TIMESHEET
- Me: 10 hours.
- The excavator: 10 hours.
- The crew: present. Allegedly.
M. Dozer
Excavator operator
Foreman's signature: pending